LNG & Pipeline Engineering

Since the first introduction of LNG to Japan in 1969, TGES has been managing operation for LNG receiving terminals and pipelines of Tokyo Gas Co., Ltd. Through the above long term service, TGES has accumulated various and numerous experiences in the operation and maintenance. By utilizing such experiences, TGES has provided a wide range of engineering and consulting services for a number of LNG receiving terminals and pipelines all over the world.

Through constant and continuous challenge with the latest technologies related to LNG receiving terminals and pipelines, TGES provides wide rages of engineering services through whole project term from planning until operation and maintenances as follows:

Feasibility Study
Front End Engineering Design
Engineering, Pricurement and Construction(Commissioning)
Operation &:amp Maintenance
Feasibility Study Front End Engineering Design Engineering, Pricurement and Construction(Commissioning) Operation &:amp Maintenance